Minutes, IBIS Quality Committee 29 October 2013 11:00-12:00 EST (08:00-09:00 PST) ROLL CALL Cisco Systems: Tony Penaloza Ericsson: Anders Ekholm Green Streak Programs: Lynne Green Huawei Technologies: Guan Tao IBM: Bruce Archambeault Greg Edlund IOMethodology: Lance Wang Intel: * Michael Mirmak Mentor Graphics: John Angulo Micron Technology: Moshiul Haque, Randy Wolff Nokia Siemens Networks: Eckhard Lenski QLogic Corp.: James Zhou Signal Consulting Group: Tim Coyle Signal Integrity Software * Mike LaBonte Teraspeed Consulting Group: * Bob Ross Texas Instruments: Pavani Jella Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- Mike LaBonte conducted the meeting. Call for opens and IBIS related patent disclosures: - None AR Review: - None New items: IBISCHK6 Parser development: - Mike showed the parser contract draft 4. - Bob asked if the copyright was necessary. - Mike suggested asking SAE. - We dropped the copyright footer - Bob said Chris seems overloaded these days. - Bob suggested "Open Forum" should be "IBIS Open Forum". - Michael suggested leaving it, SAE might change it. - We moved section 1d to 1a - Bob would like to continue to be the designated contact person. - Michael agreed - Item 10 was changed, dropping "immediately" and using "latest signing date below". - In item 11 "regular updates" was dropped. - Bob suggested dropping item #12. - This was added for a contract with Jon Powell. - Michael M: That was to allow him to walk away after 6 months if no payment was receive. - Bob preferred to have full funding before the parser is written. - Mike suggested we should have some guarantee of a parser before asking for license payments. - We changed #12 - We will require gcc 4.1.2 or later - We deleted a sentence under BIRD 160 - We discussed whether BIRD 160 checking should include tests for numeric consistency where parameter lookups are used. - Bob: Checking that vlow < vhigh for example could be complicated if each one was tied to a Range parameter, for example. - Mike: We should do that now instead of having files that pass IBISCHK6.0.0 fail in a future release. - The changes for 6.0 probably are small enough to afford additional work. AR: Mike send draft 5 of the parser development contract Meeting ended at 12:08 Eastern Time.